Post Processing Mount
Sponsor
Mitsubishi Power
Location
Engineering and Research Building- Room 1055
Start Date
30-11-2021 3:00 PM
End Date
30-11-2021 3:20 PM
Description
Producing a modular post-processing workbench for the deburring technicians at Mitsubishi Power Systems in Savannah, GA. The mount must hold a minimum of 8,500 lbs. during stationary and modular movement without endangering the health/safety of the technicians or the working part. A scaled down prototype for the workbench must be presented by the end of the semester as a required deliverable.
Post Processing Mount
Engineering and Research Building- Room 1055
Producing a modular post-processing workbench for the deburring technicians at Mitsubishi Power Systems in Savannah, GA. The mount must hold a minimum of 8,500 lbs. during stationary and modular movement without endangering the health/safety of the technicians or the working part. A scaled down prototype for the workbench must be presented by the end of the semester as a required deliverable.