Legacy Equipment Upgrade
Sponsor
Gulfstream- A General Dynamics Company
Location
Engineering and Research Building- Room 2004
Start Date
30-11-2021 3:00 PM
End Date
30-11-2021 3:20 PM
Description
Design and integration of a security system that would require an employee badge-in before allowing use of Legacy production equipment. The system will record which authorized employee enabled the unit for use, the maximum amperage draw during each operation, and the employee I.D scanned prior to a time-out. The program will also implement an auto-shutdown in the event of a time-out. The system is compatible with machinery powered by 120 VAC single-phase and 208/480 VAC three-phase.
Legacy Equipment Upgrade
Engineering and Research Building- Room 2004
Design and integration of a security system that would require an employee badge-in before allowing use of Legacy production equipment. The system will record which authorized employee enabled the unit for use, the maximum amperage draw during each operation, and the employee I.D scanned prior to a time-out. The program will also implement an auto-shutdown in the event of a time-out. The system is compatible with machinery powered by 120 VAC single-phase and 208/480 VAC three-phase.