Sponsor
Georgia Power
Location
Engineering & Research Building
Start Date
3-12-2020 2:00 PM
End Date
3-12-2020 2:30 PM
Description
Georgia Power required an electric sump pump replacement for their current pneumatic system. The mechanical team was assigned to design this backup system by using fundamental fluid mechanics equations. The pressure loss, head loss, and pumping power was specified based off of the given requirements of the system. Additionally, the specification sheet and bill of materials was revised to reflect the environmental factors that would affect the flow in the system.
Georgia Power Back-Up Sump Pump - Mechanical Design
Engineering & Research Building
Georgia Power required an electric sump pump replacement for their current pneumatic system. The mechanical team was assigned to design this backup system by using fundamental fluid mechanics equations. The pressure loss, head loss, and pumping power was specified based off of the given requirements of the system. Additionally, the specification sheet and bill of materials was revised to reflect the environmental factors that would affect the flow in the system.