Proposal Date

30-7-2019 12:00 AM

Document Type

Funded Project Report

Project Summary

Bryan Rountree, Director, Facility Operations and Services ($38,000.00)

Retrofit existing pot top lighting to new LED lights along the pedestrian walkway. Proven to increase light levels and reduce energy cost by 33%.

Unit or Academic Department

Facilities Services

Amount Granted

$38,000

Amount Spent

$38,000

Share

COinS
 
Jul 30th, 12:00 AM

Pedestrian walkway LED lighting upgrade

Bryan Rountree, Director, Facility Operations and Services ($38,000.00)

Retrofit existing pot top lighting to new LED lights along the pedestrian walkway. Proven to increase light levels and reduce energy cost by 33%.