Proposal Date
30-7-2019 12:00 AM
Document Type
Funded Project Report
Project Summary
Bryan Rountree, Director, Facility Operations and Services ($38,000.00)
Retrofit existing pot top lighting to new LED lights along the pedestrian walkway. Proven to increase light levels and reduce energy cost by 33%.
Unit or Academic Department
Facilities Services
Amount Granted
$38,000
Amount Spent
$38,000
Pedestrian walkway LED lighting upgrade
Bryan Rountree, Director, Facility Operations and Services ($38,000.00)
Retrofit existing pot top lighting to new LED lights along the pedestrian walkway. Proven to increase light levels and reduce energy cost by 33%.