Proposal Date
8-3-2016 12:00 AM
Document Type
Funded Project Report
Project Summary
Stormwater Improvements; Bioswales and Fair Road
Chuck Taylor, Campus Landscape Architect. Division Facilities Services ($33,400)
The stormwater bioswale would be located in the open space along Fair Road between Herty Dr. & Chandler Rd. The site used to contain an eroded drainage swale within the wooded site. Heavy rains and runoff from adjacent university owned streets & parking lots frequently overwhelm the site and contribute to flooding downstream. The proposed bioswale aids in slowing the runoff and filter water contaminants in an effort to mitigate current flooding and erosion.
Unit or Academic Department
Facilities Planning, Design and Construction
Amount Granted
$33,400
Amount Spent
$0.00
Stormwater Improvements; Bioswales and Fair Road
Stormwater Improvements; Bioswales and Fair Road
Chuck Taylor, Campus Landscape Architect. Division Facilities Services ($33,400)
The stormwater bioswale would be located in the open space along Fair Road between Herty Dr. & Chandler Rd. The site used to contain an eroded drainage swale within the wooded site. Heavy rains and runoff from adjacent university owned streets & parking lots frequently overwhelm the site and contribute to flooding downstream. The proposed bioswale aids in slowing the runoff and filter water contaminants in an effort to mitigate current flooding and erosion.