Proposal Date

8-3-2016 12:00 AM

Document Type

Funded Project Report

Project Summary

Stormwater Improvements; Bioswales and Fair Road

Chuck Taylor, Campus Landscape Architect. Division Facilities Services ($33,400)

The stormwater bioswale would be located in the open space along Fair Road between Herty Dr. & Chandler Rd. The site used to contain an eroded drainage swale within the wooded site. Heavy rains and runoff from adjacent university owned streets & parking lots frequently overwhelm the site and contribute to flooding downstream. The proposed bioswale aids in slowing the runoff and filter water contaminants in an effort to mitigate current flooding and erosion.

Unit or Academic Department

Facilities Planning, Design and Construction

Amount Granted

$33,400

Amount Spent

$0.00

Share

COinS
 
Mar 8th, 12:00 AM

Stormwater Improvements; Bioswales and Fair Road

Stormwater Improvements; Bioswales and Fair Road

Chuck Taylor, Campus Landscape Architect. Division Facilities Services ($33,400)

The stormwater bioswale would be located in the open space along Fair Road between Herty Dr. & Chandler Rd. The site used to contain an eroded drainage swale within the wooded site. Heavy rains and runoff from adjacent university owned streets & parking lots frequently overwhelm the site and contribute to flooding downstream. The proposed bioswale aids in slowing the runoff and filter water contaminants in an effort to mitigate current flooding and erosion.