Mathematical Sciences: Faculty Publications
Phase I Control Charts for Independent Bernoulli Data
Document Type
Article
Publication Date
9-2001
Publication Title
Quality and Reliability Engineering International
DOI
10.1002/qre.425
ISSN
1099-1638
Abstract
Phase I Shewhart p, np and runs of conforming charts are investigated. The performance of these charts are assessed using the probability of a false alarm. As with other Phase I Shewhart charts, the probability of a false alarm increases as the number, m, of samples increases for a fixed sample size, n. For a fixed value of m, the probability of at least one signal decreases as the sample size n increases. The probability of a signal for a runs of conforming chart depends on the number of samples m. Like the p and np charts, as m increases the probability of a false alarm increases. Unlike the p and np charts, the false alarm rate for a runs of conforming chart does not depend on the in-control value of p.
Recommended Citation
Borror, Connie M., Charles W. Champ.
2001.
"Phase I Control Charts for Independent Bernoulli Data."
Quality and Reliability Engineering International, 17 (5): 391-396.
doi: 10.1002/qre.425
https://digitalcommons.georgiasouthern.edu/math-sci-facpubs/501
Copyright
This work is archived and distributed under the repository's Standard Copyright and Reuse License (opens in new tab). End users may copy, store, and distribute this work without restriction. For all other uses, permission must be obtained from the copyright owners or their authorized agents.