Project Summary

Jason Schmidt, Coordinator for Physical Operations, Campus Recreation and Intramurals ($9,520.00)

This lighting upgrade project removed twenty, 455-watt metal halide fixtures in the auxiliary gym at the Recreation Activities Center and replaced them with 137-watt LED fixtures. It significantly reduced our energy consumption, decreased maintenance costs and increased light levels, which will remain consistent throughout the life of the fixture.

Unit or Academic Department

Campus Recreation and Intramurals

Amount Granted

$9,520.00

This document is currently not available here.

Share

COinS
 
Jan 1st, 12:00 AM

High Bay Lighting Upgrade at the RAC

Jason Schmidt, Coordinator for Physical Operations, Campus Recreation and Intramurals ($9,520.00)

This lighting upgrade project removed twenty, 455-watt metal halide fixtures in the auxiliary gym at the Recreation Activities Center and replaced them with 137-watt LED fixtures. It significantly reduced our energy consumption, decreased maintenance costs and increased light levels, which will remain consistent throughout the life of the fixture.