RAC and Trail – Water Fountain, Bottle Filler and Pet Fountains

Proposal Date

2018 12:00 AM

Document Type

Funded Project Report

Project Summary

Carrie Thorne, Georgia Southern Project Architect, Facilities Planning, Design and Construction ($14,775.00)

Replaced 3 existing water fountains located along the RAC walking trail and by the outdoor sports fields with a new combination unit which included a water bottle filler, an ADA compliant height standard fountain and a low pet bowl.

Unit or Academic Department

Facilities Planning, Design and Construction

Amount Granted

$14,775

This document is currently not available here.

Share

COinS
 
Jan 1st, 12:00 AM

RAC and Trail – Water Fountain, Bottle Filler and Pet Fountains

Carrie Thorne, Georgia Southern Project Architect, Facilities Planning, Design and Construction ($14,775.00)

Replaced 3 existing water fountains located along the RAC walking trail and by the outdoor sports fields with a new combination unit which included a water bottle filler, an ADA compliant height standard fountain and a low pet bowl.