Water Bottle Filler Installation: RAC and CRIBB
Proposal Date
2015 12:00 AM
Document Type
Funded Project Report
Project Summary
Water Bottle Filler Installation: RAC and CRIBB
Jason Schmidt, Facility Coordinator for Physical Operations, CRI ($2,543.70)
Retrofit six existing drinking fountains with water bottle filling stations within M.C. Anderson Park. This effort promotes the reuse of personal bottles/containers by our patrons. The water bottle fillers were installed in the following locations: natatorium (2), outside of the aquatics locker rooms, between the bathrooms off the cardio deck, hallway between MAC gym and 2 court and at the CRIBB (building located at the front entrance to the multiplex).
Unit or Academic Department
Campus Recreation and Intramurals
Amount Granted
$2,543.70
Water Bottle Filler Installation: RAC and CRIBB
Water Bottle Filler Installation: RAC and CRIBB
Jason Schmidt, Facility Coordinator for Physical Operations, CRI ($2,543.70)
Retrofit six existing drinking fountains with water bottle filling stations within M.C. Anderson Park. This effort promotes the reuse of personal bottles/containers by our patrons. The water bottle fillers were installed in the following locations: natatorium (2), outside of the aquatics locker rooms, between the bathrooms off the cardio deck, hallway between MAC gym and 2 court and at the CRIBB (building located at the front entrance to the multiplex).